LMLinkMasterCNC FIXTURE SOLUTIONS WhatsApp

Custom Fixture RFQ Checklist

Work through this before sending a custom fixture enquiry. Every blank you fill removes a round of questions — and a quote based on complete inputs is a quote that does not move later.

27 items

1 · Part data

  • 3D model

    STEP or IGES preferred. Native CAD is fine if you can share it.

  • 2D drawing with GD&T

    The tolerances actually drive the design — the model alone is not enough.

  • Datum scheme identified

    Which surfaces are primary, secondary, tertiary.

  • Material and surface condition

    As-cast, machined, painted, e-coated.

  • Part weight

  • Areas that must stay clear

    Sealing faces, cosmetic surfaces, features machined later.

2 · What the fixture must do

  • Machining, inspection, welding or assembly

  • Features to be produced or checked

    List them; 'all dimensions' is not a specification.

  • Manual load or robot load

  • Required clamping type

    Manual, pneumatic, hydraulic — or leave open for us to propose.

  • Acceptance criteria

    How you will decide the fixture is good: GR&R study, master part, first article.

3 · Machine and cell

  • Machine make and model

  • Table size and T-slot or grid pattern

  • Spindle taper

    BT30 / BT40 / BT50 / CAT / HSK.

  • Working travels (X / Y / Z)

  • Available Z clearance above the table

    Stack height comes straight out of this.

  • Existing zero-point interface, if any

    Brand and grid pitch, so the new fixture can share it.

  • Air or hydraulic supply available at the table

4 · Volume and commercial

  • Annual volume and batch size

  • Number of fixtures required

  • Target cycle time, if it constrains the design

  • Required delivery date

  • Destination country and incoterm preference

  • Documentation required

    Dimensional report, material certificates, PPAP level.

5 · Before you send

  • Files zipped and under the mail size limit

    Or a download link if the model is large.

  • Confidentiality handled

    Tell us if an NDA needs to be in place first.

  • Named technical contact

    Someone who can answer datum questions directly.

Send the completed checklist with your files. Anything you cannot answer yet is fine — mark it open and we will propose an assumption rather than guess silently.